Overcoming water, weather, and time pressures at Greenhead UTX
Client:
Network Rail
Main Contractor:
AMCO Giffen
Location:
Greenhead, Hexham
Overview
Design and construction of new Under Track Crossing (UTX) at Greenhead (Hexham), adjacent to A69.
Resolve flooding from blocked UTX impacting residential property.
Manage high water flows and debris entering Tipalt Burn.
Challenges
Historically wet area
Regular flooding risk
Risk of Tipalt Burn overflow impacting site
Our Solution
Collaborative design refinement (AMCO Giffen and site surveys)
Robust overpumping system – continuous water-level monitoring
Temporary Works:
Upgraded access track
Aluminium ground plates for compound stability
Track monitoring on 60m section of NEC2
ROTR Possession
Cleared feeder manhole and installed upstream inflatable block
Installed 900mm Z-cranked connection pipe and concrete bedding
Replaced old pipe and installed extension
Backfill ready for blockade
30-Hour Weekend Blockade
Torrential rain, poor visibility, challenging conditions
Activated standby pumps to control rising water
Works progressed ahead of schedule
Results
Completed ahead of programme
Zero incidents / accidents
Site restored to better-than-original condition
Positive feedback from landowner and client
Everyone on site kept positive and got the UTX installed well inside the programme timescales… looking forward to working with your team again.
Dave Timlin
,
Works Manager, AMCO Giffen